Efficiency in material flow is a critical component of any steel fabricator’s operation. With a unique approach, Kansas City Structural optimized the layout of their machinery to ensure a smooth and rapid movement of material through the main facility, cutting their handling down by over 50%. Wide flange beams are received on the west side of the Peddinghaus system, while tubes, pipes, angle and flat stock are received on the east side. Once a piece of material has been loaded onto the transfer conveyors, it has the freedom to seamlessly transition between different stages of production as needed.